Argyll Array Project Update #38 – November 2012

Scottish Power Renewables logoPublic Information Day (PID)

This year’s Public Information Day (PID) took place last week in An Talla.

One of the important points discussed was a proposal to revise the design of the wind farm to exclude some of the Skerryvore Reef area, which would reduce the overall size of the wind farm. A revised map of the proposed site for the wind farm was displayed.

There were also revised photomontages available, which illustrated the potential change to the visual impact of the revised site area.

Another point discussed was the options for the wind farm converter station. A slide display explained the basic differences between a facility being offshore and being onshore. (Offshore means being out at sea in the wind farm itself, as currently planned and onshore means being on land, on Tiree itself.)

These were the main areas of interest to the exhibition visitors and there was a lot of informed discussion on the day. There will be a summary of the points made by the public in a future update. Meanwhile, all of the material in the exhibition has been posted on the project web site www.argyllarray.com and I still have the actual photomontages used on the day if anyone wishes to view them directly.

A full colour booklet which reproduces most of the display material is also freely available to be picked up at various public points round the island.

Future updates

· A summary of feedback from the PID

· Progress with the Tiree Community Partnership Fund

Questions or comments

If anyone has any questions or comments on any of the above, or indeed any aspect of the project, please contact me at – Donnie Campbell, ScottishPower Renewables Community Liaison Officer, Machair, Kilmoluaig in the first instance. My land line telephone number is 220352, mobile number 07881 983753 and email donnie@argyllarray.com